Construct log shell as per engineered stamped plan and contract.
Steel Requirements Supplied and Installed:
● 1" diameter screw jacks with minimum 1⁄2" thick plates as per
engineered stamped drawings.
● 2"x 2"x 1/4" pre-cut and drilled window and door opening angle
iron as per engineered stamped drawings.
● Bottom round anchorage as per engineered stamped drawings.
● All Timber Screws, pins and dowels pertaining to the shell setup
as per engineered stamped drawings..
Wood and misc. requirements supplied and installed
● Select grade logs for construction of shell as per engineering
requirements reviewed on plan as per engineered stamped
drawings.
● “P-Gasket” insulation supplied and installed during the building
process for ease of re-assembly.
● 2x6 for rough bucks for window and door openings, supplied and
installed as per engineered stamped drawings..
● Handcrafted saddle notch Log Walls
● Use "over-scribe" construction techniques as per the International
Log Building Association standards
● Log Posts drilled for supplied screw jacks where applicable.
● Pre-drilling and mortices for electrical wire passages, switch and
plug boxes, mortice to accept faceplates.
● Window and door openings pre-cut, square and plumb to accept
supplied ruff bucks.
● Spline window and door openings to accept supplied ruff bucks.
● Pinning & bolting around openings and panel walls
● Flattening logs for installation of framing materials and second
floor gable ends
● Sanding of knots, logging scars and exposed chain saw cuts
● Logs treated with protective anti-mildew/ fungicide deterrent
● All log work conforms with the International Log Building
Association standards
● Log Stairs and Interior Log Railing as per plan where applicable.
Pre Delivery:
* Full visual inspection of all logs during tagging and numbering.
* Final spot sanding and cleanup of logs before shipping.
* Osbourne brush entire building for stain prep
*Apply non-hazardous wood treatment to prepare for staining, maintain
color and deter mold and fungus growth.
Delivery Advisor:
*Pricing for travel and accommodations included in contract documents.
* Our pricing includes on site technical assistance for the entire
re-assembly of the log package.
* On-site for the duration of log package stacking.
* Includes pre-erection review of framed floor or slab, placements of bottom
round, anchorage to foundation, stacking
of log walls and installation of log roof members.
* After the erection of the shell, our supervisors will finish the on site detail
work and consult with either general contractor or owner to ensure a full
understanding of the framing and finishing details required for the log home
which are previously laid out in the details section of the plan.
"Work” does not include the following
1.Payment and arrangement for crane on site for re-erection of log shell
unless specified in contract documentation.
2.Payment and arrangement for trucking log shell to site unless specified in
contract documentation.
3.Payment for any plans, engineering and or permitting required for log
shell unless specified in contract documentation.
We love meeting new customers, so feel free to visit our log cabin builder during normal business hours.
Murchison Enterprises Barrhead Alberta
Open today | 09:00 a.m. – 05:00 p.m. |
Copyright © 2024 Murchison Enterprises Custom Log Homes and Cabins - All Rights Reserved.
Powered by GoDaddy